Podcast: Play in new window | Download
Subscribe: Email | TuneIn | 
Just as launch complex 34 dwarfed its predecessors, Saturn’s checkout represented a new magnitude in launch operations. The Saturn C-1 stood three times higher, required six times more fuel, and produced ten times more thrust than the Jupiter. Its size, was only a part of the challenge to the Launch Operations Directorate at Cape Canaveral…

Early Concepts of C-1 and C5
 

First Horizontal Mating of Saturn
 

Configuration of Saturn Block 1 and 2
 

Test of the Palaemon Barge
 

Booster Movement around Wheeler Dam
 

S-I & S-IV Stages Aboard Barge
 

Route of the Barge from Tenn. to Fla.
 

Unloading Barge in Florida
 

Lifting Saturn SA-1 First Stage
 

Hoisting Saturn SA-1 First Stage
 

Erecting the Upper Stages of Saturn SA-1
 

Launch Complex 34 from the Air